Process Downtime Level

Process Downtime Level measures the extent to which an operational process is available and running.

 

Process Downtime Level = (TA t / PPT t) x 100

Where:

PPT t is the Planned Productive Time that a process should be available in a given time period t.

TA t is the actual productive time that a process has been available in a given time period t.

 

This indicator is included in the book: Key Performance Indicators - the 75+ measures every manager needs to know, which contains an in-depth description of this KPI, as well as practical advice on data collection, calculations, target setting, and actual usage.

Back to our Key Performance Indicator Library


View the most insightful and relevant Key Performance Indicators in your business area.


Connect with Bernard Marr